Client

City of Cranbrook

Location

Cranbrook, BC

The indoor aquatic facility at Western Financial Place is operated by the City of Cranbrook.
Prism conducted an energy audit, followed by detailed design and specification for a new heat recovery chiller. This low-carbon alternative provides pool dehumidification heat recovery to offset heating by natural gas boilers.
Natural gas consumption was reduced by 4,100 GJ per year (equivalent to approximately $35,000 in savings) and approximately 220 tons CO2e per year of GHG reductions, or 30% of sitewide emissions.